LUKOIL's Power and Heat Supply Facilities Ready for Heating Season

All LUKOIL Group's power and heat supply companies have obtained 2022-2023 winter preparedness certificates. The Company implemented 1308 measures under its winterization programmes. Use of advanced survey technologies and robots for the diagnostics made it possible to detect and fix any technical problems in a timely manner. The Company's power facilities with total installed capacity of 4.9 GW, as well as its network of 27 thousand kilometres of the power transmission grid and 2.1 thous…

Read the full story at https://www.webwire.com/ViewPressRel.asp?aId=296561

Source: webwire.com
LUKOIL's Power and Heat Supply Facilities Ready for Heating Season